Weather Banter

Weather Banter (https://www.weather-banter.co.uk/)
-   sci.geo.meteorology (Meteorology) (https://www.weather-banter.co.uk/sci-geo-meteorology-meteorology/)
-   -   Oh The Irony! Desal Plant Construction Delayed By Heavy Rain!! (https://www.weather-banter.co.uk/sci-geo-meteorology-meteorology/149189-re-oh-irony-desal-plant-construction-delayed-heavy-rain.html)

Sapient Fridge November 25th 10 06:34 AM

Oh The Irony! Desal Plant Construction Delayed By Heavy Rain!!
 
In message , gig2o z0bn
writes

"Sylvia Else" wrote in message
...
On 23/11/2010 4:02 PM, 99o z0bn wrote:
ROTFLMAO

Oh The Irony! Desal Plant Construction Delayed By Heavy Rain!!

Brumby's giant money pit

Warmie whackoism can be very expensive as well as pointless.


How much did those 20/20 hindsight spectacles cost you? Government
decisions have to be based on the information available at the time
they're made.




No hindsight needed!
Any rational person could see through all the whacko predictions made based
on fudged climate models!


So a one-off period of rain means there is no drought?

Funny that, in Saudi Arabia it rains very heavily about once a year but
they still call it a desert area. Maybe you should let them know that
they are wrong and they actually have plenty of water?

Australia will go back to drought soon enough.
--
ICQ #17887309 * Save the net *
Grok:
http://spam.abuse.net http://www.cauce.org * nuke a spammer *
Find: http://www.samspade.org http://www.netdemon.net * today *
Kill: http://mail-abuse.com http://au.sorbs.net http://spamhaus.org


All times are GMT. The time now is 05:11 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 WeatherBanter.co.uk