sci.geo.meteorology (Meteorology) (sci.geo.meteorology) For the discussion of meteorology and related topics.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old November 25th 10, 06:34 AM posted to sci.geo.meteorology,alt.energy.renewable,alt.politics.bush,alt.conspiracy
external usenet poster
 
First recorded activity by Weather-Banter: Jun 2010
Posts: 51
Default Oh The Irony! Desal Plant Construction Delayed By Heavy Rain!!

In message , gig2o z0bn
writes

"Sylvia Else" wrote in message
...
On 23/11/2010 4:02 PM, 99o z0bn wrote:
ROTFLMAO

Oh The Irony! Desal Plant Construction Delayed By Heavy Rain!!

Brumby's giant money pit

Warmie whackoism can be very expensive as well as pointless.


How much did those 20/20 hindsight spectacles cost you? Government
decisions have to be based on the information available at the time
they're made.




No hindsight needed!
Any rational person could see through all the whacko predictions made based
on fudged climate models!


So a one-off period of rain means there is no drought?

Funny that, in Saudi Arabia it rains very heavily about once a year but
they still call it a desert area. Maybe you should let them know that
they are wrong and they actually have plenty of water?

Australia will go back to drought soon enough.
--
ICQ #17887309 * Save the net *
Grok:
http://spam.abuse.net http://www.cauce.org * nuke a spammer *
Find: http://www.samspade.org http://www.netdemon.net * today *
Kill: http://mail-abuse.com http://au.sorbs.net http://spamhaus.org
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Greenie Desal Insanity, Just Like All Other Greenie Schemes,Will Cripple Us Martin Brown sci.geo.meteorology (Meteorology) 18 November 13th 10 06:45 AM
Greenie Desal Insanity, Just Like All Other Greenie Schemes,Will Cripple Us Martin Brown sci.geo.meteorology (Meteorology) 1 November 12th 10 03:00 PM
Oh...any old irony, any old irony, any any any old irony. [email protected] uk.sci.weather (UK Weather) 2 March 14th 07 01:49 PM
[Ship report - delayed] Mike Tullett uk.sci.weather (UK Weather) 0 August 30th 06 02:12 PM
Delayed Storm Surge? fred sci.geo.meteorology (Meteorology) 3 September 28th 05 08:51 AM


All times are GMT. The time now is 05:13 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 Weather Banter.
The comments are property of their posters.
 

About Us

"It's about Weather"

 

Copyright © 2017