Home |
Search |
Today's Posts |
![]() |
|
sci.geo.meteorology (Meteorology) (sci.geo.meteorology) For the discussion of meteorology and related topics. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
In message , gig2o z0bn
writes "Sylvia Else" wrote in message ... On 23/11/2010 4:02 PM, 99o z0bn wrote: ROTFLMAO Oh The Irony! Desal Plant Construction Delayed By Heavy Rain!! Brumby's giant money pit Warmie whackoism can be very expensive as well as pointless. How much did those 20/20 hindsight spectacles cost you? Government decisions have to be based on the information available at the time they're made. No hindsight needed! Any rational person could see through all the whacko predictions made based on fudged climate models! So a one-off period of rain means there is no drought? Funny that, in Saudi Arabia it rains very heavily about once a year but they still call it a desert area. Maybe you should let them know that they are wrong and they actually have plenty of water? Australia will go back to drought soon enough. -- ICQ #17887309 * Save the net * Grok: http://spam.abuse.net http://www.cauce.org * nuke a spammer * Find: http://www.samspade.org http://www.netdemon.net * today * Kill: http://mail-abuse.com http://au.sorbs.net http://spamhaus.org |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Greenie Desal Insanity, Just Like All Other Greenie Schemes,Will Cripple Us | sci.geo.meteorology (Meteorology) | |||
Greenie Desal Insanity, Just Like All Other Greenie Schemes,Will Cripple Us | sci.geo.meteorology (Meteorology) | |||
Oh...any old irony, any old irony, any any any old irony. | uk.sci.weather (UK Weather) | |||
[Ship report - delayed] | uk.sci.weather (UK Weather) | |||
Delayed Storm Surge? | sci.geo.meteorology (Meteorology) |